Formwork reinforcement and concrete placing specifications will be found in the concrete and piles section.
Concrete encased duct bank design. Boxes and not concrete manholes. 554 2 ft 3. Concrete encased conduit duct bank penetrations into manholes shall continue completely through the wall of the manhole and shall use one large hole rather than several smaller holes. However i do not see anything within the nec that demands a duct bank encased in concrete to be used unless you are doing so to gain a reduction in cover when it comes to 0 2000v applications.
Duct bank reinforcing duct bank reinforcing isaacstructural structural op. Duct bank. Page 1 of 8 concrete encased duct bank i. Minimum concrete coverage on bottom.
Use walls of trench to form side walls of duct bank where soil is self supporting and concrete. Concrete encased ductbank iv. Minimum concrete coverage on left. Duct banks with metal casings often use grout or sand as a filler material to stabilize the duct bank prevent damage to the conduit and help maintain its shape.
Granted we see information about duct banks with regards to 2001v to 35000v. Cables installed in concrete encased pvc duct this type of system is typically used in urban areas where. Scope the work under this section is limited to the assembly of the spacers and ducts required to form the duct bank. Paramerters for the structural design of 33kv duct bank under roads.
Additional circuits will be added routinely. Manual of design and specification standards 3 pages 16115 2 03 04 underground conduit and duct bank installation requirements above 600v 600 v and below other systems below building slabs pvc or grs 36 deep red concrete encasement 3000 psi pvc or grs 18 deep no concrete encasement required pvc or grs 24 deep. Duct banks with steel or concrete casings use pvc spacers to separate the internal conduits from the concrete walls of the duct bank. Reinforce concreteencased duct banks where they cross disturbed earth and where indicated.
Minimum concrete coverage on right. Load density is significant. Concentration of circuits via the same route are planned or expected. A siemens business collaborated to identify potentially less obvious process and design limitations and trade offs between the three samp techniques.
Volume of duct bank. Motorcity structural 4 nov 04 16 25 you will also want to provide some type of strap or bar to prevent the ducts from floating to the top of the concrete when it is poured. I would have my concrete spec 03300 defer to site concrete for the duct encasement.